VICKREY provided civil engineering and surveying services to support the design for the extension of runway 03/21 meeting exacting FAA criteria. Services included roadway and drainage design of the relocation of the airport perimeter road and the NE Entrance Road, construction administration services, H&V control for aerial mapping, a profile survey of each of the three runways, and design and preparation of plans for the realignment of gas supply main across the northern side of the airport.
Services