ACWP Govalle 5 Wastewater System Improvements

Austin, TX
Submitted by sharkadmin on Sun, 12/26/2021 - 05:08

VICKREY provided design, survey, and construction phase services. VICKREY's design included a new 21-inch wastewater line and improvements to the existing system including bolted manholes to prevent leakage, removing bends in the existing alignment, encasing the new line in the creek bed in concrete, and redesigning the system for code compliance. The design also included tree protection plans, erosion and sedimentation control, creek stabilization, re-vegetation notes, and pedestrian and traffic control plans.